https://newsletter.po.creamermedia.com
Deepening Democracy through Access to Information
Home / News / South African News RSS ← Back
Africa|Building|Construction|Flow|Infrastructure|Pipes|PROJECT|Sanitation|Service|System|Technology|Testing|Water|Flow|Infrastructure|Cables
Africa|Building|Construction|Flow|Infrastructure|Pipes|PROJECT|Sanitation|Service|System|Technology|Testing|Water|Flow|Infrastructure|Cables
africa|building|construction|flow-company|infrastructure|pipes|project|sanitation|service|system|technology|testing|water|flow-industry-term|infrastructure|cables
Close

Email this article

separate emails by commas, maximum limit of 4 addresses

Sponsored by

Close

Article Enquiry

Phase 1 of Hammanskraal drinking water project completed, water yet to flow

Close

Embed Video

Phase 1 of Hammanskraal drinking water project completed, water yet to flow

18th November 2024

By: Natasha Odendaal
Creamer Media Senior Deputy Editor

ARTICLE ENQUIRY      SAVE THIS ARTICLE      EMAIL THIS ARTICLE

Font size: -+

The first phase of the drinking water project for Hammanskraal has been completed, with the first of four modules of the Klipdrift potable water package plant set to increase availability of potable water for parts of the region.

The Department of Water and Sanitation (DWS) last year allocated R758-million for the upgrading of the 40 Ml/d Klipdrift water treatment plant to address water supply and quality challenges in Hammanskraal through the construction of a package plant to provide additional water into the existing bulk water infrastructure.

Advertisement

The potable water treatment plant project, undertaken by Magalies Water as an implementing agent, which also manages the water treatment plant, is being implemented in four phases.

Each of the 4 modules is expected to add 12.5 Ml capacity of water a day, and the currently completed module will supply residents of Marokolong, Ramotse, Kekana Gardens, Kudube Unit 9 and Babelegi Industria, as well as parts of Mandela Village and Bridgeview informal settlement.

Advertisement

Once all 4 modules are concluded, it will add a total of 50 Ml of treated water into the existing 42 Ml capacity Klipdrift water treatment works.

However, while Phase 1 is completed, with 12.5 Ml of treated water available, further testing is being conducted by the City of Tshwane to ascertain that the water that passes the reticulation system is of good quality and meets the standard as required by the law.

This includes flushing and backflushing of the pipes to remove all unnecessary dirt on the reticulation pipeline.

According to Water and Sanitation Minister Pemmy Majodina, contamination of the water coming from the new plant along the reticulation pipeline was detected, owing to the linked pipeline system from the Temba water treatment plant and illegal connections.

This has resulted in water from module 1 needing further analysis and adding to further delays. Further testing of the water will be done by the City of Tshwane, the DWS and Magalies Water to ensure that quality is not compromised.

“Today we want to confirm to you that module 1 is complete. We can confirm that our water is ready to be pumped. However, when dealing with water, you must do all due diligence so that by the time the water comes out in people’s homes it is clean and drinkable. Together with Magalies and the City of Tshwane, we are conducting necessary due diligence,” she explained during an inspection of the project over the weekend.

“We have not reneged, we have done what we were supposed to do, and we will continue to do what is needed. We are committed to giving the community of Hammanskraal quality, drinkable water. We do not want to regret anything by rushing out and giving water, we want to ensure that there is no doubt in its quality, which has been one of the biggest concerns in this area,” Majodina commented.

Acting Tshwane Mayor Councillor Eugene Modise said that the City of Tshwane required about two weeks to finalise clearing the reticulation pipeline that will distribute the water to the residents.

Meanwhile, Water and Sanitation co-Deputy Minister David Mahlobo said this was the first time that the technology – potable water package plant – was used on a large scale such as the 50-Ml-a-day capacity plant.

“When it comes to infrastructure rollout in South Africa, we are looking into the possibility of building better, faster and more efficient infrastructure, while taking into account climate change and demand by growing communities.

“What is unique about this intervention is that the source of raw water was already confirmed. The infrastructure was also suitable in that it could absorb the new load and there are already existing reservoirs. Moving forward with this kind of technology saves land space,” he added.

Discussing measures that needed to be taken to curb infrastructure vandalism, co-Deputy Minister Sello Seitlholo called on the municipality to work with communities and law enforcement to curb vandalism and to bring to book those who commit malicious damage to water infrastructure.

“Vandalism is costing millions [particularly to metropolitan municipalities] to replace cables, more often than not. There needs to be engagement with the South African Police Service,” he concluded.

EMAIL THIS ARTICLE      SAVE THIS ARTICLE ARTICLE ENQUIRY

To subscribe email subscriptions@creamermedia.co.za or click here
To advertise email advertising@creamermedia.co.za or click here

Comment Guidelines

About

Polity.org.za is a product of Creamer Media.
www.creamermedia.co.za

Other Creamer Media Products include:
Engineering News
Mining Weekly
Research Channel Africa

Read more

Subscriptions

We offer a variety of subscriptions to our Magazine, Website, PDF Reports and our photo library.

Subscriptions are available via the Creamer Media Store.

View store

Advertise

Advertising on Polity.org.za is an effective way to build and consolidate a company's profile among clients and prospective clients. Email advertising@creamermedia.co.za

View options

Email Registration Success

Thank you, you have successfully subscribed to one or more of Creamer Media’s email newsletters. You should start receiving the email newsletters in due course.

Our email newsletters may land in your junk or spam folder. To prevent this, kindly add newsletters@creamermedia.co.za to your address book or safe sender list. If you experience any issues with the receipt of our email newsletters, please email subscriptions@creamermedia.co.za